"MID-FAST LIMIT" PROJECT
A new prodcut studied and designed to withstand extreme conditions
Go to PageWe placed attention on obtaining great results in realizing projects for the Oil & Gas sector; this has allowed us to be extremely flexible in locating our modules from the Islands to the African Desert.
A new prodcut studied and designed to withstand extreme conditions
Go to PageA new product studied and designed to withstand extreme conditions.
Go to PageEach temporary mobile camps includes all required personnel health and welfare arrangements, project offices, living accommodation, training rooms, construction and material storage facilities, vehicl…
Go to PageTurnkey Camp complete with dormitories, recreational facilities, kitchen and dining facility, gym. All the buildings and facilities are connected by a modular arctic corridor.
Go to PageEDILSIDER built a big camp for "Grupo Desarrollo Infraestructura", in Mexico. Supply of 501, 1001, 2001, SIDERHALL and SHELTER prefabricated buildings to accommodate 750 people.
Go to PageEDILSIDER built a camp in Tunu, Nigeria, for Desicon. Supply of SIDERHALL and 2001 prefabricated buildings for 1.500-man camp.
Go to PageEDILSIDER built a 200-man moving camp in Cameroon for Sicim Company.
Go to Page